When you need a SEP
Write a SEP for:- A new, changed or removed protocol feature or method (a new RPC method such as
tools/execute, a new capability negotiation field, a change to a transport) - Any change that is not backward compatible
- A change to message formats or schema structure
- An interoperability convention supported outside the core specification
- A governance or process change
- Anything controversial or with several plausible designs, such as a change to how authorization works
SEP types
- Standards Track: a new protocol feature or implementation, or an interoperability standard supported outside the core specification.
- Informational: a design issue or guidance for the community, with no new feature.
- Process: a process surrounding MCP, or a change to one.
- Extensions Track: a protocol extension. It receives the same review and acceptance as Standards Track. An accepted Extensions Track SEP moves the extension to Beta, and a second one moves it to Stable (see Extension Lifecycle for the stages).
Before you write
A SEP needs sponsorship from a working group or the Core Maintainer group before formal review (see Sponsors). Most proposals start with a working group. To get a working group’s sponsorship:- Check whether the idea fits the current focus on the roadmap. SEPs outside its priority areas face a longer queue and a higher bar (see SEP Prioritization).
- Bring the idea to the working group that covers the area, in its Discord channel or at a meeting (see Joining a group). An interest group can help frame the problem first, and a working group sponsors the SEP.
- Reach consensus in the working group, then draft a SEP that the group wants to sponsor. Read the design principles, try the idea as an extension first where its shape allows, and build a prototype that meets the Prototype Requirements.
- The working group brings the SEP to the Core Maintainers for review through the Workflow.
#general on Discord can help find people to join a new working group.
Workflow
- Copy
seps/TEMPLATE.mdtoseps/0000-<slug>.mdand fill it in. - Open a pull request against the specification repository, titled
sep: <description>as insep: propose task cancellation, following the pull request title guidelines. Authors who are not members of themodelcontextprotocolGitHub organization ask the working group’s leads or the sponsor to open the pull request and name them as the author. - The SEP number is the PR number. Rename the file (PR #1850 becomes
seps/1850-<slug>.md), update the header, and runnpm run generate:seps, or thecheck:sepsCI job fails. Rename the pull request tosep(SEP-1850): <description>. A follow-up commit is enough, with no amend or force-push. Later pull requests about this SEP keepSEP-1850as their scope and link to it in the description. - Until a working group or the Core Maintainers agree to sponsor the SEP, it stays a draft pull request. A draft pull request is for developing a proposal in the open. It is not yet in the SEP process, the
Statusheader in the SEP stays unset, and thewg-support-neededlabel marks it. - Once a group has agreed to sponsor the SEP, the pull request is marked ready for review. The
Sponsorheader names the person who acts on the sponsoring group’s behalf, and that person setsdraft. Review takes place in PR comments. - When the SEP is ready, the sponsor verifies that the sponsorship decision and prior discussion are linked in the pull request description, then sets
in-review. The WG Lead or sponsoring Core Maintainer submits it to the SEP review queue. Release managers schedule reviews during the release cycle’s review window. The author and sponsor may present the proposal. - Core Maintainers decide under Review and acceptance. The sponsor records the outcome,
acceptedorrejected, on the PR and in the SEP header. - For an accepted SEP, the author adds to the same PR: the specification prose, the
schema.tschanges with regenerated output (see CONTRIBUTING.md), a changelog entry, and any required documentation edits (for a deprecation, the four edits under Deprecating a Feature). The reference implementation is completed where it lives: an SDK branch, a fork or a standalone repository (see Prototype Requirements). For a Standards Track SEP with observable protocol behavior, the conformance scenario andsep-NNNN.yamlare merged (see Conformance Test Requirement). SDK implementations are not required for Final. - The sponsor verifies these artifacts and sets
final. The PR is then merged.
Status values, also defined on the SEP index:
A SEP that has no sponsor after 180 days is marked
dormant and its PR is closed. Dormant is not rejected: a dormant SEP is revived by finding a sponsor and reopening the PR, which returns it to draft.
Sponsors
A working group sponsors a SEP. The Core Maintainers can also sponsor one. Both paths lead to the same review and the same acceptance requirements.- Working group sponsorship: the working group whose scope the SEP falls in approves it through its decision-making process. Before you write covers how a working group comes to sponsor a SEP.
- Core Maintainer sponsorship: the Core Maintainers agree to sponsor the SEP and designate a Core Maintainer to represent them. No separate working group approval is required, and the designated Core Maintainer consults the relevant working groups. Note that this path is the exception. In general Core Maintainers will not sponsor SEPs. The usual case is a proposal that comes from the Core Maintainers directly.
Sponsor header names the Maintainer or Core Maintainer who acts on the sponsoring group’s behalf, as in Name (@handle), on behalf of the Transports Working Group or Name (@handle), on behalf of the Core Maintainers. A qualified WG Lead may fill this role for a working group. For the Core Maintainers, the designated Core Maintainer does. The rest of this page calls this person the sponsor.
The sponsor is responsible for the SEP’s status and labels and for tracking its implementation. The sponsor reviews the proposal and requests changes, presents it with the author, brings it to the Core Maintainers for review, verifies the Final artifacts, and makes every status change in the Workflow. That covers the Status field in the SEP file, which is canonical, and the matching PR label, which is for filtering. A sponsor without write access to the branch sets the field through the author. Authors do not edit Status or labels themselves. They ask their sponsor.
The sponsoring group, the sponsor and the author are responsible for moving the SEP forward. When the author cannot open pull requests on the repository, one of the working group’s leads or the sponsor opens the pull request and names the author. The SEP is numbered from that pull request as usual.
A WG Lead may also triage and close in-scope SEPs under Leadership, subject to appeal to Core Maintainers.
Prototype Requirements
A SEP needs a working prototype before it can be accepted: an implementation in an official SDK as a branch or fork, a standalone proof of concept of the key mechanics, integration tests that exercise the proposed behavior, or a reference server or client. The prototype should show that the core functionality works as described and that the API design is practical and ergonomic, surface edge cases and implementation problems, and be runnable by reviewers from included setup instructions. Pseudocode alone, or a design document without code, is not sufficient. Production quality is not required.Review and acceptance
Core Maintainers reviewin-review SEPs during the release cycle’s review window, from 6 months before release until the soft freeze date. Release managers publish the agenda and proposal links 2 weeks before each meeting. Review considers the working prototype, benefit to the MCP ecosystem, community support and consensus, and fit with the roadmap and design principles.
Release managers order the SEP review queue by roadmap alignment and then by the date each proposal became ready for review.
After the presentation, the sponsor opens a recorded seven-calendar-day vote and links the record from the SEP PR. Acceptance requires more than half of the Core Maintainers to vote in favor. The vote stays open for all seven days and must conclude before the soft freeze date.
The sponsor records the tally, decision, rationale, and follow-up on the PR and in the SEP review queue. If more than half of the Core Maintainers vote against a SEP, it is marked rejected and does not move forward in its current form. The author can revise the proposal based on the feedback and resubmit it for review. A proposal that reaches neither threshold returns to draft for revision or later review.
All current Core Maintainers, including Lead Maintainers, are eligible to vote. Emeritus members are not. The voting record lists the eligible voters and the revision being voted on. Abstentions and absences do not count as votes in favor, and a majority of the maintainers attending a meeting is not sufficient on its own.
If the proposal changes materially during the vote, it returns to review, and votes cast for the earlier revision do not carry over. A vote that cannot conclude before the review window closes is deferred to the next window.
Lead Maintainers keep their existing authority. A proposal that amends governance also has to meet the stricter requirements of the governance amendment procedure.
Conformance Test Requirement
A Standards Track SEP that introduces or modifies observable protocol behavior cannot reachfinal until the conformance repository has:
- A scenario tagged with the SEP number, targeting the repository’s draft spec-version tag.
- A traceability file,
sep-NNNN.yaml, mapping every MUST, MUST NOT, SHOULD and SHOULD NOT in the SEP’s Specification section to a check ID or to a documented exclusion, with a tracking issue where the exclusion is a framework gap. - The scenario passing against the SEP’s reference implementation.
sep-NNNN.yaml covers every normative statement, and the conformance repository’s maintainers review the scenario PR for technical correctness. Writing the scenario before Core Maintainer review is encouraged, not required. SEP-2484 defines the traceability format and the dispute process.
After the decision
A rejected SEP may be revised against the recorded feedback and resubmitted, or answered with a competing SEP. Before Final, raise problems on the SEP’s PR. A Final SEP is a frozen record of the design as accepted. Where the specification has since diverged, the specification governs: report problems as issues against it, not as edits to the SEP. A SEP is withdrawn at the author’s request. The author or the sponsor setswithdrawn. A SEP that replaces an earlier one carries a Supersedes: line in its header, and the earlier SEP is set superseded.
Ownership of a SEP may pass to a new author when the original author no longer has time for it or cannot be reached. The original author stays on as co-author if they wish. Disagreement with the author’s direction is not grounds for transfer. Write a competing SEP instead.
Template and tooling
SEP files live inseps/, and each file’s git history is the record of the proposal. seps/TEMPLATE.md gives the structure: a preamble, then Abstract, Motivation, Specification, Rationale, Backward Compatibility, Security Implications and Reference Implementation. The Abstract is about 200 words. Insufficient Motivation is by itself grounds for rejection. The Specification must be detailed enough for independent, interoperable implementations. In the Rationale, record the alternatives considered, the objections raised and the evidence of consensus. Backward Compatibility is mandatory whenever the SEP introduces an incompatibility, and states its severity and the migration path. Security Implications are stated explicitly, including when there are none.
npm run generate:seps renders the files into docs/seps/, and npm run check:seps verifies that the rendered pages are current. For a worked example, see SEP-2567, a recent Final Standards Track SEP.